Measurement of a custom-shaped pond for geotextile

View Categories

Measurement of a custom-shaped pond for geotextile

Why choose a custom-shaped geotextile? #

A custom liner allows the geotextile to fit the shape and features of the pond as optimally as possible. This helps avoid excess material and waste.

Before we dive into the process of designing a custom geotextile, let’s take a look at how a simple, rectangular liner differs from a custom-designed solution.

Custom-shaped geotextile

Rectangular-shaped geotextile

Custom geotextile Design #

When manufacturing custom geotextile, we cut liner strips to size and weld them together. It’s similar to trying to follow the shape of the pond basin using shorter and longer rectangles (see image above).

The width of the liner strips is always 5.3 meters (the liner size can be increased in steps of this width). So, one dimension of the liner depends on how many strips are welded together. For example, if 7 liner strips are needed, the final liner width will be 7 × 5.3 m = 37.1 m.

The length of the liner strips varies depending on the shape of the pond basin, and they can also be offset relative to each other to accurately follow the contours of the pond.

The first step in custom geotextile design is an on-site survey, where you need to determine the exact lengths of liner strips required based on the shape of your pond, and how they will fit together.

You must record the data collected during the measurements and enter it into the custom liner design app, which will generate the final blueprint for your order based on your measurements.

To ensure accurate results, you will need the following tools: #

Use a 30, 50 or 100-meter measuring tape, depending on the size of the pond

This will be used to draw the shape of the pond and record your measurements

You can mark reference points on the ground with them

Make sure to have at least one assistant with you during the survey

Overview of the Survey Process #

The description below is quite detailed, as it covers many important aspects to ensure the survey is successful.
But don’t worry — the concept is very simple and consists of just three steps:

2. Then, mark the positions of the ribs along the spine

3. Finally, measure the length of each rib on both sides of the spine

Marking the Spine Line #

This is the first task of the survey.
The process is a bit like drawing a skeleton: first, you mark a spine line, and then you draw the ribs onto it.

There are two ways to define the spine line:

Option A

You can lay the measuring tape parallel to the longest and straightest side of the pond.

The advantage of this method is that it minimizes liner waste due to the shape of the pond, and it makes it easier to measure the rib lengths in the next step. Additionally, during installation, it is much easier to find the correct position for the liner when unfolding it.

The disadvantage is that if the spine line parallel to the straightest side does not touch all points of the basin (i.e., does not cover the longest possible path), then it may be difficult to apply.

Choose this option wherever possible.

Option B

You can lay the measuring tape by connecting the two most distant points of the pond.

The advantage of this method (which solves the disadvantage of the previous one) is that the spine can run through the entire basin, and rib measurements can be taken on both sides.

The disadvantage is that both edges of the liner will follow the shape of the basin in a stepped manner, which requires slightly more material. It is also a bit harder to find the correct position for the liner during installation, and the exact size is harder to estimate not only on one side, but on both sides of the spine. This is because in this case, the ribs will not be perpendicular to the outline of the basin anywhere, so it is recommended to plan with a small surplus for each measurement to ensure the liner is not smaller than needed (see later).

The spine line will be parallel to the selected side if you determine two points by measuring equal distances from the edge of that side toward the center of the basin.

Mark the spine line using the measuring tape by connecting these two points. In this case, the measuring tape should pass through both points.

The spine line is always straight, while the shape of the pond may not be. If there is a significant difference between the two, try marking the spine line along a different path.

Marking the rib positions #

The next task is to mark lines that are perpendicular to the spine line. These lines are the ribs.

Let the beginning of the measuring tape (0 m), which represents the spine line, extend beyond the edge of the pond by the amount needed for securing. The very beginning of the tape (0 m) marks the planned edge of the liner, meaning that at the pond’s edge, the tape will show the securing allowance (about 100–180 cm).

The ribs must be marked along this spine line. The first rib should be marked at 5.3 meters on the measuring tape.

So:

  • The 0 m point (the very beginning of the tape) is placed outside the basin.
  • At the edge of the pond, the value shown on the tape corresponds to the securing allowance (e.g. 1.3 m).
  • The first rib is marked at 5.3 m, the second at 10.6 m, the third at 15.9 m, then 21.2 m, and so on, in increments of 5.3 m.

Measuring the rib lengths #

You need to measure the length of each rib at every point you previously marked (on both sides of the spine line — first on the right side, then on the left side). Do it as follows:

  1. Take out your paper and pen and make a sketch to make the process easier. Draw a straight line roughly in the middle of the page — this will be the spine line.
  2. Draw as many perpendicular lines (ribs) to the spine line as you previously marked. Start drawing each rib from the spine line and end at the edge of the pond basin. Measure the length of each rib and record your measurements on the sketch.

When it’s worth planning with slightly longer liner dimensions #

Here are some tips to keep in mind to make sure the liner is never smaller than needed.

Sometimes it’s necessary to plan with slightly more than the measured lengths because the liner sheet is a flat, spread-out material. First, it has to line a three-dimensional shape with depth. Second, the liner is made from a single piece, so different parts of the basin interact with each other — a section that requires more material can reduce the available liner size from multiple directions.

Compared to the survey, the liner sheet will not settle into the pond basin in a perfectly predictable way, so it’s better to plan with safety margins to avoid unpleasant surprises.

If there is a peninsula or similar protrusion in the basin

In this case, the basin will require some extra material from the direction of the spine line, because the liner must curve up onto the peninsula.

It’s recommended to position the spine line so that the tape curves onto the peninsula while still remaining straight. This way, it covers a longer path, meaning the tape will show a higher value along the spine line.

Additionally, folds will form at the base of the peninsula when placing the liner sheet, so extra material must be provided from above, from the edge of the basin. For a peninsula, add 40–70 cm of extra length to each rib that runs through the peninsula or the protruding section of the basin.

Also, add 40–70 cm to one rib before and one rib after the affected area (neighboring ribs).

If the rib’s measuring tape line ends at a curved shoreline

In this case, the less of a right angle the measuring tape forms with the shoreline, the more liner material will be needed for securing.

Additionally, there is some measurement inaccuracy in the direction of the rib: on such curved sections, the tape can show very different values depending on whether the person reading it shifts slightly to the right or left.

Because of this, for curved shorelines, depending on the curvature and the securing method, add 0.5 to 1.2 meters of extra length to the affected ribs.

To help estimate the amount of extra material needed, always include the securing allowance in the rib length during measurement. It also helps to test how much the tape measurement changes when placed in slightly different positions.

Planning with more material is always safer than risking a shortage during installation just to save a few square meters.

Here is the translation without any formatting:

If the length of two consecutive ribs differs significantly, add a small extra length to the shorter rib: if the difference is over 1 meter, add 0.3 meters; if over 1.5 meters, add 0.5 meters; if over 2 meters, add 0.8 meters.

In case of significant difference, the discrepancy should only be considered on either side A or side B relative to the spine line. Do not add the measurements of sides A and B together.

If the shape of the riverbed is very angular or its deepening is more like steps, increase the length of each rib by 30 to 50 centimeters.

If measurements can only be taken on one side of the spine line, only that side should be considered. #

In this case, the steps are as follows:

You can only measure the rib in one direction from the spine line.
Lay the measuring tape along the rib as usual, then measure the distance between the spine line and the edge of the lakebed that is closer to the spine.

Record this distance on the drawing with a negative sign on the empty side of the spine line (where no ribs need to be measured because there is no lakebed on that side).

The negative value will indicate how far this measurement needs to be shifted relative to the spine.

2. Measure the distance between the two edges of the lake — this will be the length of the rib.

3. Add the extra length for fastening and other material allowances to the end of the rib that is farther from the spine line, either for securing or due to the shape of the lakebed.

4. Add the necessary extra material allowance to the beginning of the rib that is closer to the spine line, in a way that increases the rib length toward the spine, either for fastening or due to the shape of the lakebed.

For example, if the negative value was -3.0 meters and you add 1.8 meters of extra material, the negative value changes to -1.2 meters.

This means the rib moves closer to the spine line.

It may also happen that so much extra material needs to be added to the rib that the negative value becomes positive.

In this case, a positive number will appear on both sides of the spine line.
For example, if the value is -3.0 meters and you need to add 1.8 + 2.4 meters (where 1.8 meters is for fastening and 2.4 meters is due to the shape of the lakebed), then the rib will be -3 + 1.8 + 2.4 = 1.2 meters in one direction.

If a positive number appears on the other side of the rib due to the negative value turning positive, then no additional material needs to be added to that side.

Congratulations — if you’ve made it this far, you’re past the hardest part!

From this point on, you’ll only need the recorded values and the geotextile designer at lotusgarden.eu to have your liner layout ready in just a few minutes!